Feasibility Studies, Design and Cost Estimate of the Basic Infrastructure at Pelkarzhing Lap.

Name of the Client: 

Project Description: 

The main objective of this assignment was to prepare Detail Project Report (DPR) of all the basic Infrastructure for
Pelkarzhing LAP, Phuentsholing Thromde through the following stages:

A. To carry out a Feasibility study the tasks carried out were: –

  • Conduct detailed field study for data and information collection
  • Conduct detailed engineering survey and data collection.
  • Analyze data, design, and provide alternate.
  • Carry out analysis including economic, social, environmental, financial impact assessment analysis and other aspects.
  • Organize presentation and consultation meeting if required.
  • Conduct field verification and additional data collection if required.
  • Submit final feasibility study report to Thromde with incorporation of all the comments and feedback.

B. To carry out detail Design and Estimate of the basic infrastructure :

  • Carry out the Detailed Design & Drawing.
  • Preparation of Detailed BoQ, Estimates, and Specifications.
  • Preparation of Tender Documents.

Scope of work: 

  • Carry out the Detailed Design & Drawing.
  • Preparation of Detailed BoQ, Estimates, Specifications and Tender Documents.

Specific details of the works are:

  • Roads & Drains- Total Length- 17964 m (width-18.6m, 12m, 10m, 9m, 6m, & 4.5m)
  • Total No of Culverts- 43.
  • Water Supply Network-Total Length- 24640m, Water Reservoirs designed- 150, 300, 350, 500 Cum.
  • Street Light- Total Length- 18610m.
  • Footpath & Storm Water Drainage- Total Length Footpath- 645m & Total Length Drains- 6900m.
  • Sewerage network- Total Network Length- 16300m & Treatment plant- 1MLD.